Real C-P2W22-2504 dumps Accurate Questions and Answers with Free and Fast Updates [Q24-Q43]

Share

Real C-P2W22-2504 dumps Accurate Questions and Answers with Free and Fast Updates

Real C-P2W22-2504 Quesions Pass Certification Exams Easily

NEW QUESTION # 24
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.

  • A. Float before production
  • B. Transit time
  • C. Load time
  • D. Setup time
  • E. Queue time

Answer: A,D,E


NEW QUESTION # 25
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. MRP creates a dependent requirement.
  • B. A sales order is created.
  • C. MRP creates a planned order.
  • D. A sales order is delivered.

Answer: B


NEW QUESTION # 26
Which of the following are replenishment strategies for Kanban containers?
Note: There are 2 correct answers to this question.

  • A. Replenishment using planned independent requirements
  • B. Replenishment using direct transfer posting
  • C. Replenishment using reservations
  • D. Replenishment using process orders

Answer: B,C


NEW QUESTION # 27
How do you assign resources in a master recipe with operations and phases?

  • A. You assign resources to the sub-operations.
  • B. You assign resources to the operations.
  • C. You assign resources to the header of the master recipe.
  • D. You assign resources to the phases.

Answer: B


NEW QUESTION # 28
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.

  • A. Automatic goods issue on confirmation
  • B. Default order types
  • C. Automatic release on order creation
  • D. Automatic goods receipt on confirmation
  • E. Automatic print on order creation

Answer: B,C,D


NEW QUESTION # 29
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?

  • A. Flexible Planning
  • B. Standard Sales and Operations Planning
  • C. Integrated Business Planning
  • D. Advanced Planning

Answer: C


NEW QUESTION # 30
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

  • A. When several operations are maintained for one product
  • B. When several production versions are maintained for one product
  • C. When multiple planned orders are scheduled in parallel on one resource
  • D. When alternative resources are used within one operation

Answer: D


NEW QUESTION # 31
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?

  • A. SAP Signavio Process Governance
  • B. SAP Signavio Process Insights
  • C. SAP Signavio Process Manager
  • D. SAP Signavio Process Intelligence

Answer: C


NEW QUESTION # 32
What is the purpose of the pull list in material staging?

  • A. To control the flow of material from the production storage location to the central storage location
  • B. To control the flow of material from the supplier to the central storage location
  • C. To control the flow of material from the central storage location to the production storage location
  • D. To control the flow of material from the supplier to the production storage location

Answer: C


NEW QUESTION # 33
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.

  • A. In assembly production, a sales order triggers the creation of a production order
  • B. In make-to-stock production, you can manually create production orders
  • C. In assembly production, confirmation of scrap triggers the creation of a production order
  • D. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order

Answer: A,B


NEW QUESTION # 34
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.

  • A. You post the entire manufactured quantity to one batch if the product quality changes during production.
  • B. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
  • C. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
  • D. You post the entire manufactured quantity to multiple batches if the product quality changes during production.

Answer: B,D


NEW QUESTION # 35
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.

  • A. Changing a storage bin
  • B. Changing an operation time
  • C. Changing a dependent requirement
  • D. Changing a delivery address

Answer: B,C


NEW QUESTION # 36
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Plant
  • C. Work center
  • D. Material

Answer: C,D


NEW QUESTION # 37
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The lot size range must be within the lot size range of the assigned routing.
  • B. The consistency check must be performed.
  • C. The assigned routing and bill of material (BOM) must have the same validity period.
  • D. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
  • E. The deletion flag must NOT be set for the bill of material (BOM) or the routing.

Answer: A,B,D


NEW QUESTION # 38
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?

  • A. The operation is rescheduled to an alternative work center.
  • B. The operation is rescheduled backwards.
  • C. The operation CANNOT be dispatched.
  • D. The operation is rescheduled in the planning direction.

Answer: D


NEW QUESTION # 39
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.

  • A. Operation duration
  • B. In-house production time
  • C. Planned delivery time
  • D. Total replenishment lead time

Answer: B,C


NEW QUESTION # 40
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.

  • A. Manufacturing time for final assembly is reduced.
  • B. The delivery time is reduced.
  • C. You have the option to use make-to-order production.
  • D. You have the option to use forecast planning.

Answer: C,D


NEW QUESTION # 41
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

  • A. The MRP run starts with external procurement.
  • B. The MRP run starts with in-house production.
  • C. The MRP run plans the material only if a quotation has been maintained.
  • D. The MRP run does NOT consider the material; it has to be planned interactively.

Answer: B


NEW QUESTION # 42
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.

  • A. One-off events
  • B. Past sales order quantities
  • C. Market intelligence
  • D. Past quotation quantities
  • E. Past production planning quantities

Answer: A,B,C


NEW QUESTION # 43
......