NEW QUESTION # 24
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.
- A. Float before production
- B. Transit time
- C. Load time
- D. Setup time
- E. Queue time
Answer: A,D,E
NEW QUESTION # 25
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. MRP creates a dependent requirement.
- B. A sales order is created.
- C. MRP creates a planned order.
- D. A sales order is delivered.
Answer: B
NEW QUESTION # 26
Which of the following are replenishment strategies for Kanban containers?
Note: There are 2 correct answers to this question.
- A. Replenishment using planned independent requirements
- B. Replenishment using direct transfer posting
- C. Replenishment using reservations
- D. Replenishment using process orders
Answer: B,C
NEW QUESTION # 27
How do you assign resources in a master recipe with operations and phases?
- A. You assign resources to the sub-operations.
- B. You assign resources to the operations.
- C. You assign resources to the header of the master recipe.
- D. You assign resources to the phases.
Answer: B
NEW QUESTION # 28
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.
- A. Automatic goods issue on confirmation
- B. Default order types
- C. Automatic release on order creation
- D. Automatic goods receipt on confirmation
- E. Automatic print on order creation
Answer: B,C,D
NEW QUESTION # 29
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?
- A. Flexible Planning
- B. Standard Sales and Operations Planning
- C. Integrated Business Planning
- D. Advanced Planning
Answer: C
NEW QUESTION # 30
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?
- A. When several operations are maintained for one product
- B. When several production versions are maintained for one product
- C. When multiple planned orders are scheduled in parallel on one resource
- D. When alternative resources are used within one operation
Answer: D
NEW QUESTION # 31
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Governance
- B. SAP Signavio Process Insights
- C. SAP Signavio Process Manager
- D. SAP Signavio Process Intelligence
Answer: C
NEW QUESTION # 32
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the production storage location to the central storage location
- B. To control the flow of material from the supplier to the central storage location
- C. To control the flow of material from the central storage location to the production storage location
- D. To control the flow of material from the supplier to the production storage location
Answer: C
NEW QUESTION # 33
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.
- A. In assembly production, a sales order triggers the creation of a production order
- B. In make-to-stock production, you can manually create production orders
- C. In assembly production, confirmation of scrap triggers the creation of a production order
- D. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order
Answer: A,B
NEW QUESTION # 34
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to one batch if the product quality changes during production.
- B. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
- C. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
- D. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
Answer: B,D
NEW QUESTION # 35
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing a storage bin
- B. Changing an operation time
- C. Changing a dependent requirement
- D. Changing a delivery address
Answer: B,C
NEW QUESTION # 36
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Plant
- C. Work center
- D. Material
Answer: C,D
NEW QUESTION # 37
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The lot size range must be within the lot size range of the assigned routing.
- B. The consistency check must be performed.
- C. The assigned routing and bill of material (BOM) must have the same validity period.
- D. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
- E. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
Answer: A,B,D
NEW QUESTION # 38
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?
- A. The operation is rescheduled to an alternative work center.
- B. The operation is rescheduled backwards.
- C. The operation CANNOT be dispatched.
- D. The operation is rescheduled in the planning direction.
Answer: D
NEW QUESTION # 39
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. Operation duration
- B. In-house production time
- C. Planned delivery time
- D. Total replenishment lead time
Answer: B,C
NEW QUESTION # 40
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. Manufacturing time for final assembly is reduced.
- B. The delivery time is reduced.
- C. You have the option to use make-to-order production.
- D. You have the option to use forecast planning.
Answer: C,D
NEW QUESTION # 41
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?
- A. The MRP run starts with external procurement.
- B. The MRP run starts with in-house production.
- C. The MRP run plans the material only if a quotation has been maintained.
- D. The MRP run does NOT consider the material; it has to be planned interactively.
Answer: B
NEW QUESTION # 42
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. One-off events
- B. Past sales order quantities
- C. Market intelligence
- D. Past quotation quantities
- E. Past production planning quantities
Answer: A,B,C